How to Solve Problems After Concrete Mixing Plant Being Into Production
Date: Apr 14, 2015 Source: admin
Some unexpected obstacles will happen after concrete mixing plant production line is formally put into production because of bigger yield strength. This passage will provide some tips to solve these problems.
1. The deviation fault phenomenon of belt in concrete mixing plant. In the process of no-load or over-load, the belt conveyor may run to slightly right or left, which causes material leakage and abnormal wear and damage. As a result, the efficiency is reduced and even it affects the normal work of the whole equipment. Why do this happen? Because the external force on the belt and itself force cannot be offset, or the uneven force of tensile stress. There are many factors leading to the run-out of rubber belt. So we should solve the problem from the conveyor design, manufacture, installation, use and maintenance, etc. If the firmness on either side of the belt is not same or the height is not same, the deviation will happen.
2. Skill consideration of operators. Engineering concrete mixing plant has low requirements for operation and maintenance personnel. However, commercial concrete mixing plant has complex structures and high automation, so it is natural to have a stricter requirement for operators.
3. After operation, operators should clear out the materials and water in water tank and pipeline. The machines should also be cleaned and maintained. The work site should be cleared and cut off power supply and lock the switch box.
4. In construction of high-rise buildings in winter, warm work should be done well according to regulation. In summer, heatstroke should be prevented.
Tags: MARINTEC INDONESIA 2019 in Congoputzmeister concrete pump truck in Cape Verdeself concrete mixerschwing concrete pumps for sale in Somalia planetary mixer concrete in Guineaon site concrete batching plant in Cameroon
Previous: How to Distinguish the Cement Quality of Concrete Mixing Plant
Next: The Property of Concrete Mixing Plant
NEWS
- 48m Truck Mounted Concrete Boom Pump Delivery To Cayman Islands
- TS100 Skid Steer Loader was Delivered to South Asia
- HMC350 self loading concrete mixer truck delivery to Ghana
- HZ40-28 Backhoe Loader was Delivered to South America
- HMC400 Self-loading mobile concrete mixer was sent to Peru
- DHBT30 Diesel Engine Concrete Pump was Delivered to South Asia
- video of concrete mixer
- video of concrete mixer
- What is Green Concrete?
Products
Concrete Mixers
Concrete Batching Plant
Concrete Conveying Plant
- HBT/DHBT series Concrete Pump
- Truck Mounted Concrete Pump
- Elevator shaft Self-climbing Concrete Placing Boom
- Mobile Hydraulic Concrete Placing Boom
- Floor climbing Hydraulic Concrete Placing Boom
- Concrete Transit Mixers
- XBS/DXBS Fine Stone Concrete Pump
- Manual Concrete Placing Boom
- Electric Concrete Pump(HBT Series)
- Diesel Concrete Pump(DHBT series)
Related Concrete Equipment
Concrete Block Making Plant
- Hydraulic Block Making Machine
- Concrete Block Making Machine
- Cement Brick Making Machine
- Automatic Brick Manufacturing Plant
- Interlocking Brick Making Machine
- QT4-20 Block Making Machine
- QT5-20 Block Making Machine
- QT4-15 Automatic Block Making Plant
- QT8-15 Automatic Block Making Plant
- QT10-15 Automatic Block Making Plant